Hello and Happy Easter,
I once made up a calendar that counts 365/366 days,
so every 4 years 366 days, moreover you can also use certain days
such as holidays, birthdays whatever for days, adjust
so that an event is automatically triggered. New Year's Eve is already fixed
set with fireworks.
I got the idea for this calendar while building a bench. Since I do not deal
that the bank employees should have a 7-day week,
I wanted to set the days of the week for a free weekend. With the construction
I used an old circuit from my elevator and rebuilt it.
I noticed that the days can be counted wonderfully with it,
and this is the first version of the calendar.
so now times a few pictures...
The display shows the month, weeks of the month and days of the week.
A still a little too small room to set
of public holidays or personal days (changes
in v2). The calendar can start from a desired month
can be started with the desired day (month, day
and leap year are adjustable, month weeks are not
because when you change the month automatically always
is the 1st of the month).
2 connections leading to the roof for certain events,
the 2 exits on the roof, where you can go at will
Installing circuits, launchers or whatever
can for his selected event.
4 preinstalled launchers with fireworks rockets
which automatically turns empty on New Year's Eve
Fire and then shut down again.
To set a specific day you need
you get a gate which has 3 inputs and 1 output.
As already mentioned, the space here is still very limited,
which will be very different with the v2.
Then you draw from the desired month a
Line to the gate,
a line from the day still to the gate,
and now just pick the weeks of the month.
The monthly weeks are now still used for
Day finding (which also changes in v2),
i.e. 1st week of the month stands for the 1st - 7th day of the month
2. Week of the month stands for the 8th - 14th day of the month
3. Week of the month stands for the 15th - 21st day of the month
4. Week of the month stands for the 22nd - 28th day of the month
5. Week of the month stands for the 29th - 31st day of the month.
When the selected tag is connected
you only need the desired event
either on the roof, or individually
Run lines to the outside.
Ok that's it from me I wish you still
Happy Easter.
Your ZebraHummel
Please the video about it! Will build that also times :p
COOOOOOOOOOOOL!
This is really a great system!
LIKE